Hydroelectric Power Plant Generator Cooling System

  • Industry: Energy
  • Basic data: Manufacture and installation of the generator cooling system
  • Project Year: 2026.-2030.
  • Status: In production

Turnkey

Turnkey Solution

Energy

Industry

AISI 316L

Stainless steel

The project is being carried out in Croatia as part of the national energy sector, with implementation planned from 2026. to 2030. Our scope includes the manufacture and installation of the generator cooling system, as well as participation in the reconstruction of the hydroelectric power plant’s generating units. 

The project covers the installation of cooling systems and associated piping for Units A and B at the Hydroelectric Power Plant, including testing, commissioning, and technical handover. The scope also includes project coordination, schedule management, quality control, safety and technical documentation, factory and on-site acceptance testing, and delivery of all required final documentation.

Project scope: 

Project photos

0+
SUCCESSFUL PROJECTS
Delivered Since 2020.
0+
BLUE-CHIP CLIENTS
Continuing Clients & Projects
0 mil€
BACKLOG ORDERS
To Be Delivered Until 2028.

Industries we serve

Process equipment and engineering expertise for demanding production environments.

Tell us about your project

Share your requirements and supporting documents. We’ll review your inquiry and recommend the next step.